Small Wind Turbine InstallationJohnson Center for Environmental Innovation
Funded by the National Science Foundation
Specifications
Skystream 3.7 Turbine
Spec. sheet
Inverter specification
Installation manual
45 foot tall monopole tower
Spec. sheet
Foundation plan and instructions
Link to graph of most recent day's production
(this is in beta and may load slowly and probably won't work on Chrome)
Installation photo journal
Thanks to Bruce Budin and Bob Hahn from Physical Plant for leading a quality installation effort. Thanks to Ken Kocmik from the City of St. Peter for work on the interconnection.
Excavation (1 Nov. 2011)
Concrete forms (2 Nov. 2011)
Pouring the foundation (3 Nov. 2011)
Turbine installation (13 Dec. 2011)
Dedication (24 Jan. 2012)